Flagship Projects |
|
VIJAYAWADA -RANCHI CORRIDOR- BRIEF AT A GLANCE |
The Vijayawada-Ranchi Corridor (North-South Corridor) connects Vijayawada in Andhra Pradesh with Ranchi in Jharkhand passing through Odisha. The total length of the Corridor is 1632.00Km. The length of Corridor in Andhra Pradesh is 236.00Km & in Jharkhand is 177.00Km. The balance length of 1219.00Km is in Odisha. The length falling in Odisha comprises of 239.30Km NHs & 979.70Km State Roads. The route passes through Odisha covering 12 tribal & backward districts. The district wise length covered in Odisha portion is: |
|
Sl.No |
Districts |
Length of State road
(In Km) |
Length of NHs
(In Km) |
Total length
(In Km) |
1 |
Malkangiri |
160.70 |
0.00 |
160.70 |
2 |
Koraput |
122.20 |
22.00 |
144.20 |
3 |
Rayagada |
136.65 |
0.00 |
136.65 |
4 |
Gajapati |
58.50 |
0.00 |
58.50 |
5 |
Ganjam |
118.40 |
4.80 |
123.20 |
6 |
Kandhamal |
89.00 |
0.00 |
89.00 |
7 |
Boudh |
9.00 |
34.50 |
43.50 |
8 |
Sambalpur |
77.63 |
3.00 |
80.63 |
9 |
Angul |
23.13 |
23.30 |
46.43 |
10 |
Deogarh |
59.10 |
48.70 |
107.80 |
11 |
Keonjhar |
33.29 |
92.00 |
125.29 |
12 |
Mayurbhanj |
92.10 |
11.00 |
103.10 |
|
TOTAL |
979.70 |
239.30 |
1219.00 |
|
Objectives: |
State Government has been constantly endeavoring for development of the segment of Vijayawada-Ranchi Corridor within Odisha so as to facilitate development of Left Wing Extremism prone areas in order to bring the inhabitants, who are mainly poor tribal to join the main stream of society. Development of this corridor is anticipated to reduce Left Wing Extremism activities in those areas. Besides, on implementation of this project, a through connection will be available from Vijayawada to Ranchi with accessibility to the vulnerable areas, which will open new avenues for development in these areas, equitable development of the undeveloped areas presently deprived of basic necessities and removal of the regional disparities with improved road connectivity. |
|
Source of Fundings till now : |
Sl No. |
Source of fundings |
Amount Allotted
(Rs. In Crore) |
1 |
State Plan |
115.84 |
2 |
SARCA |
120.00 |
3 |
Additional Central Assistance |
40.00 |
4 |
World Bank Loan Assistance |
40.00 |
5 |
Central Road Fund |
195.08 |
6 |
Planning Commission Allocation |
100.00 |
7 |
LWE Scheme,Govt. of India |
69.01 |
8 |
V.R. Corridor, Govt. of India |
1125.97 |
|
Total |
1805.90 |
|
|
Technical Specification: |
a. |
Widening of Carriageway to 2-Lane standard |
|
|
b. |
Widening of Formation width to 12.00Mtr. |
|
|
c. |
Broad Provisions:-Earth Work in embankment, Granular Sub base(GSB),BaseCourse-WMM,Bituminous Course-DBM/BM,BC/SDBC, Minor & Major Bridges, Cross Drainage works, Road side Drain & Retaining Wall etc. |
|
Achievements so far: |
i. |
Length taken up- 936.00Km of State Roads |
|
|
ii.. |
Length completed-264.83Km |
|
|
iii. |
Expenditure incurred-Rs.520.67 Crore |
|
|
|
|
|
|
|