Works Department
Works Department
 
Works Department
 
  Flagship Projects
VIJAYAWADA -RANCHI CORRIDOR- BRIEF AT A GLANCE
The Vijayawada-Ranchi Corridor (North-South Corridor) connects Vijayawada in Andhra Pradesh with Ranchi in Jharkhand passing through Odisha. The total length of the Corridor is 1632.00Km. The length of Corridor in Andhra Pradesh is 236.00Km & in Jharkhand is 177.00Km. The balance length of 1219.00Km is in Odisha. The length falling in Odisha comprises of 239.30Km NHs & 979.70Km State Roads. The route passes through Odisha covering 12 tribal & backward districts. The district wise length covered in Odisha portion is:
 
Sl.No Districts Length of State road
(In Km)
Length of NHs
(In Km)
Total length
(In Km)
1 Malkangiri 160.70 0.00 160.70
2 Koraput 122.20 22.00 144.20
3 Rayagada 136.65 0.00 136.65
4 Gajapati 58.50 0.00 58.50
5 Ganjam 118.40 4.80 123.20
6 Kandhamal 89.00 0.00 89.00
7 Boudh 9.00 34.50 43.50
8 Sambalpur 77.63 3.00 80.63
9 Angul 23.13 23.30 46.43
10 Deogarh 59.10 48.70 107.80
11 Keonjhar 33.29 92.00 125.29
12 Mayurbhanj 92.10 11.00 103.10
  TOTAL 979.70 239.30 1219.00
Objectives:
State Government has been constantly endeavoring for development of the segment of Vijayawada-Ranchi Corridor within Odisha so as to facilitate development of Left Wing Extremism prone areas in order to bring the inhabitants, who are mainly poor tribal to join the main stream of society. Development of this corridor is anticipated to reduce Left Wing Extremism activities in those areas. Besides, on implementation of this project, a through connection will be available from Vijayawada to Ranchi with accessibility to the vulnerable areas, which will open new avenues for development in these areas, equitable development of the undeveloped areas presently deprived of basic necessities and removal of the regional disparities with improved road connectivity.
 
Source of Fundings till now :
Sl No. Source of fundings Amount Allotted
(Rs. In Crore)
1 State Plan 115.84
2 SARCA 120.00
3 Additional Central Assistance 40.00
4 World Bank Loan Assistance 40.00
5 Central Road Fund 195.08
6 Planning Commission Allocation 100.00
7 LWE Scheme,Govt. of India 69.01
8 V.R. Corridor, Govt. of India 1125.97
  Total 1805.90
 
Technical Specification:
a. Widening of Carriageway to 2-Lane standard
   
b. Widening of Formation width to 12.00Mtr.
   
c.
Broad Provisions:-Earth Work in embankment, Granular Sub base(GSB),BaseCourse-WMM,Bituminous Course-DBM/BM,BC/SDBC, Minor & Major Bridges, Cross Drainage works, Road side Drain & Retaining Wall etc.
Achievements so far:
i. Length taken up- 936.00Km of State Roads
   
ii.. Length completed-264.83Km
   
iii.
Expenditure incurred-Rs.520.67 Crore
   
 
 
 
 
 
Works Department
Disclaimer     |     Terms & Conditions     |     Contact Us     |     Admin
 
Works Department
Works Department